|
Projects
Wells
Intakes
Raw Water Pump Stations
Booster Pump Stations
Elevated Tanks
Ground Storage Reservoirs
Treatment Facilities
Transmission Mains
Distribution Systems

6.0 MG Ground Storage
Reservoir with 10 MGD Booster Pump Station in Base of 750,000
Gallon Elevated Tank, Naperville, Illinois
|
(Above) 1.0 MG Ground
Storage Reservoir and Pump
Station, Mundelein, Illinois
Services
Treatability Studies
Preliminary Reports
Master Planning
Distribution System
Analyses
System Evaluations
Design/Preparation
of Plans and Specifications
Design/Build
Rate Studies
Purchase Feasibility
Studies
Obtaining Permits from
Regulatory Agencies
Construction Administration
and Inspection
Operation and Maintenance
Manuals
Start-up and Training
Assistance
Operations Troubleshooting
and Process Control

(Above) 2MGD Surface Water Treatment
Plant, Carlyle,
Illinois
|